Client story, shared with permission. Civil EIT, licensed via PEO — Full-Service CBA Writing.

The situation

Amara had everything an assessor should want: four years on municipal infrastructure projects, design and construction exposure, a supportive supervisor. She also had three failed CBA submissions behind her when she found PengCBA.

What was going wrong

Her drafts told the story of impressive projects — but not of Amara. Paragraphs opened with “the project team,” actions were listed as responsibilities, and outcomes stopped at “the project was completed successfully.” Each resubmission polished the prose without changing the structure, and each came back with the same verdict.

What we did

In the intake interview, we mapped her experience against all 34 competencies and found something important: her best examples were not the ones she had chosen. A small stormwater design she dismissed as “routine” demonstrated independent technical judgment far better than the flagship project she had led with.

We rebuilt her submission around nine stories selected for indicator coverage, interviewed her to extract the personal decisions inside each one, and drafted every example in strict Situation–Action–Outcome form with named methods, codes, and quantified results.

The result

Approved on the next submission. In her words: “Having someone who actually understood how assessors read these examples made all the difference.”

If you recognize your own drafts in her “before” picture, start with a free consultation — or read why assessors reject good engineers to diagnose the pattern yourself first.

Share this article: LinkedIn Facebook X Email

Want a licensed P.Eng. to check your draft?

Start with a free consultation — tell us your background and target association, and we reply within one business day.

Free Consultation